pagi Syawal - at Koole Pernis,Rotterdam...kuih raye dah nak abis sbb hari2 makan..haha
Date - 30 AUG 2011
0400H : 1HR notice to E/R
0455H : Engine telegraph tested. Ship clock sync with E/R. Comms. tested. Satisfactory.
0500H : M/E blown thru by air.
0505H : M/E tested on fuel.Tested ahead and astern propulsion. Satisfactory.
0515H : Steering system tested hardover to hardover with presence of duty engineer at steering gear room.All found satisfactory.
0530H : All navigation equipment tested. All found satisfactory.
0545H : R.S.B.E / P.O.B
0600H : Fwd and aft tug made fast. / Comm single up
0612H : Vessel cast off
0630H : 1st engine movement.
0648H : 1st line ashore
0712H : Vessel in position
0730H : Fwd and aft tug cast off / Pilot away / All fast 4x2 at Koole,Pernis port side alongside
0742H : R.F.W.E
after a whole morning of documentation, sampling and gauging of cargo onboard, we commenced discharge of approx. 4000MT of downstream palm oil product to the terminal in the afternoon.
didn`t got the chance to attend morning prayers coz we are short on hands, but still the food is good.
thus, that is how i celebrate the 1st of Syawal... : )
"SELAMAT HARI RAYA AIDILFITRI"
-come to sea and see for yourself-